- Location: 6650 County Highway M, Verona, Wisconsin
- Available acres: 1-100 acres of development and redevelopment sites (Liberty Business Park and Verona Technology Park)
- Topography: No significant topography issues that could present major obstacles to industrial development of the site. Gently rolling topography appears to be easily gradable.
- Zoning: Industrial-light
- Site certification: Yes
- Setting: Industrial park
- Within city limits: Yes
Site information sheet [PDF]
Site map [PDF]
Transportation
- Nearest interstate: Interstate 39-90 (15 miles)
- Nearest four-lane highway: U.S. Highway 18/151
- Nearest commercial airport: Dane County Regional Airport (18.6 miles)
- Freight airport access: Dane County Regional Airport located within 20 miles.
- Rail served: No
Utilities
- Electric: Alliant Energy (Site served by a 24.9 kV underground loop feed. Substation located adjacent to site and served by a 138 kV ATC transmission line and 69kV transmission line.)
- Gas: Madison Gas & Electric (Pressure: 60 psi)
- Sewer distribution: City of Verona and Madison Metropolitan (Peak capacity at plant per day: The present reliable capacity of the SE Pressure Zone is 1,110 gpm or 1,600,000 gpd. Nearest pump station is 2 miles from the site.)
- Water distribution: City of Verona (Peak capacity at plant per day: 720,000 gallons. Pressure: 68 psi.)
- Telecommunications: TDS Fiber